Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Long Beach Steam Station, Plant #2



You might also be interested in

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit #8 auxiliary generator exciter. [Plus three additional Unit 8 shots (#24906: main generator, #24907: CO2 fire protection equipment, & #24908: generator cooling water circulation pump) on same photocard].

    photCL SCE 02 - 24905

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Unit #7 Dual-driven exciter set. [Plus additional shot (#25163: Unit 7 evaporator & evaporator drip pump) on same photocard].

    photCL SCE 02 - 25162

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Long Beach Steam Station No. 3 turbo installation, Boiler No. 50, laying 15" gas main, driving piles for Unit No. 11, take-off towers, towers at channel crossing, installing transformers and oil switches, switching garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab, fuel oil pump room, exciter, piles ready for steel.

    photCL SCE

  • Image not available

    Long Beach Steam Station

    Visual Materials

    Long Beach Steam Station - Plant 3 construction photos, turbo installation, Boiler #50, laying 15" gas main, to L.B.S.S., driving piles for Unit #11, take-off towers, towers at channel crossing, installing transformers and oil switches, Switching Garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab., fuel oil pump room, exciter, piles ready for steel.

    photCL SCE 13 - vol 092

  • Long Beach Steam Station, Plant #2

    Long Beach Steam Station, Plant #2

    Visual Materials

    Long Beach Steam Station, Plant #2 - Cleaning & repair for units 7 & 8. [Plus three additional shots (#25429: Preparing foundation for #9 west circulating water pump, #25430: Progress construction of Unit 8-R, & #25431: Installing evaporator & condensate booster pump for Unit 8-R) on same photocard].

    photCL SCE 02 - 25428

  • Long Beach Steam Station - Plant #2

    Long Beach Steam Station - Plant #2

    Visual Materials

    Long Beach Steam Station - Plant #2 - West Motor Driven Circulating Pump.

    photCL SCE 02 - 27775